  The Manyoni Uranium Project

  马尼奥尼铀矿项目

  

  PL5830/2009, PL5832/2009, PL5834/2009, PL7334/2011, PL9017/2013, PL9018/2013

  Manyoni District, United Republic of Tanzania

  

  PL5830/2009, PL5832/2009, PL5834/2009, PL7334/2011, PL9017/2013, PL9018/2013

  坦桑尼亚联合共和国马尼奥尼区

  

  EXECUTIVE SUMMARY

  摘要

GEOLOGICAL PERSPECTIVE地质远景
  • Secondary Mineral Uranium Resources – currently 28 Mlbs U3O8; 次生矿铀资源–目前含有2800万磅U3O8

  • Higher grade potential requires extrapolation and exploration using current regional knowledge. 其高品位潜力需要利用当前区域知识进行外推和勘探。

  The Manyoni Uranium Project is located in Central Tanzania approximately 600 km West of Dar es Salaam and comprises 6 active tenements covering a total area of 690 km2. Extensive Uranium anomalism has been identified across current tenements with secondary mineralisation defined in a shallow sequence of sandy clays, with sand and gravel horizons within playa lakes developed from recent rift faulting. The playa lakes form concentration and trap points for uranium enriched ground and surface waters, and uranium mineralisation occurs through enrichment of the sedimentary sequence and underlying granitic saprolite. The secondary uranium minerals comprise an upper schrockingerite zone overlying a lower carnotite zone. To date existing Mineral Resources have only been calculated within four of the secondary playa deposits (88.8Mt @ 143ppm for 28Mlbs U3O8, 100ppm cut-off). The calculated Indicated and Inferred mineral resources for the Manyoni Uranium project are available in Table 1. The C1_HG deposit which is part of the greater C playa deposit has an average grade of 460 ppm U3O8 highlighting the potential for higher grade Uranium mineralisation within the region.

  马尼奥尼铀矿项目位于坦桑尼亚市中心,达累斯萨拉姆以西约600公里处,由6个有效的租约区组成,占地总面积690平方公里。在目前的租约区,已经发现有大量的铀异常,这些租约区属于浅沙粘土序列,具有次生矿化区域,其中沙子和砾石区域位于最近的裂隙断层发展成的干盐湖内。这些干盐湖泊构成了富含有铀矿土地和地表水的富集和断点,并通过沉积序列和下面的花岗岩风化土发生铀矿化作用。次生铀矿物包括上部的schrockingerite带,其上覆盖有下层的钒钾铀矿带。迄今为止,对现有的矿产资源的计算,只针对四处次生干盐湖矿床(资源量8880万吨,含量143ppm,U3O8含量为2800万磅,边界品位100ppm)。经过计算,马尼奥尼铀矿项目的控制矿产资源和推断矿产资源情况如表1所示。C1_HG矿产属于大型C类干盐湖矿产的一部分,U3O8的平均品位460 ppm,这突出显示该地区具有高品位铀矿化区域的潜力。

  

  


Indicated控制资源量

Inferred推断资源量

Total合计

Deposit矿床

Tonnage吨位 (Mt)百万吨

Grade品位 (U3O8PPM)

Pounds U3O8 (M)百万

Tonnage吨位 (Mt)百万吨

Grade品位 (U3O8PPM)

Pounds U3O8 (M)百万

Tonnage吨位 (Mt)百万吨

Grade品位 (U3O8PPM)

Pounds U3O8 (M)百万

A




14

150

4.6

14.0

150

4.6

C1_LG

10.8

150

3.6

37

140

11.4

47.8

142

15.0

C1_HG

0.8

460

0.8




0.8

460

0.8

C WEST




3

140

0.9

3.0

140

0.9

E




19

130

5.5

19.0

130

5.5

F




4

140

1.2

4.0

140

1.2

TOTAL合计

12

347

4.3

77

139

23.7

88.8

143

28.0


  

  


  Table 1: Manyoni Uranium Mineral Resources at 100ppm cut-off. Note: numbers may not add correctly due to rounding.

  表1:马尼奥尼铀矿资源情况,边界品位100ppm。注:由于四舍五入的原因,数字加总结果可能不正确。

  The Manyoni Uranium Project exploration potential is highlighted in only one model for mineralisation having been tested, this being the playa style deposit. There has been no testing for models like valley or channel fill (e.g. Langer Heinrich) or sandstone hosted deposits similar to th e Mkuju Uranium Project owned by Magnis Resources or the Nyota deposit owned by Uranium One. The surface radiometric expression of a playa deposit can easily mask mineralisation and although there are other playa anomalies that can be defined within the current tenement package there has been very little exploration below a depth of 15m. Of the few deeper drill holes a hole drilled to 46m had 1m at 866ppm near the end of hole and so it is believed that below some of the playa deposits it is possible to have mineralised calcrete, sand and basal conglomerate intervals of a potential sandstone hosted deposit. Further exploration targeting a regional model for Uranium deposition can only assist in the definition of further uranium mineralisation within the Manyoni Uranium Project.

  马尼奥尼铀矿项目的勘探潜力就在于,已经经过测试的矿化模式目前只有一种,这就是干盐湖式矿床。对于其他模式尚未进行过测试,如山谷或水道充填(如兰格海因里希)或砂岩式赋存矿床,类似于由马格尼斯资源公司拥有的E Mkuju铀矿项目或由Uranium One公司拥有的妮欧塔铀矿床。对于干盐湖式矿床的地表辐射结果可能容易掩盖矿化情况,虽然有其他干盐湖异常情况,并可以在目前的租约区内圈定,但是对于低于15米以下深度区域的勘探工作开展很少。为数不多的深部钻孔,已经深至46米,在钻孔底端附近发现有1米,含量为866ppm的矿化带,所以在一些盐湖矿床的下面,可能有潜在砂岩式赋存矿床的矿化钙质结砾岩、砂岩和底砾岩聚集体间隔存在。进一步勘探的目标是铀矿床的区域模式,只有这样,才能够协助圈定马尼奥尼铀项目内的其他铀矿化区域。

  1

  


上一篇:NACHU石墨项目推荐下一篇:Thatcher Soak Uranium Project_Executive Summary
矿业翻译现场
400-6010-935 工作日:00:00-24:00
周六日:09:00-18:00
E-mail:853495100@qq.com 免费咨询热线:400-6010-935 010-82865216 备案号:京ICP备11030261号-2 侵权声明网站地图
北京阳光创译语言翻译有限公司 地址:北京市海淀区五道口华清嘉园甲15号楼2008室